Skip to the sheet
Tailgate BriefSTSC study sheets
Menu

Sheet 28Mix-up sheet · Excavation, trenching and confined spaces

Confined space entry: who signs, who stays out, what you test first

Test oxygen first, flammable gases second and toxic gases third, with a calibrated direct-reading instrument, in the order 29 CFR 1926.1204(e) lists them. The reason for going first with oxygen is mechanical: a combustible-gas sensor needs oxygen to read correctly, so an oxygen-poor space can make an explosive one look harmless.

Why the order matters as much as the meter

Flammables come before toxics because a fire or explosion at the opening reaches everyone near it, the attendant and the next trade over included, while a toxic gas mostly harms whoever breathes it. Toxics are measured last, against their permissible exposure limits.

Construction asks for more than a reading at the start. Under 29 CFR 1926.1204, monitoring during the entry is continuous where the equipment exists, which is stricter than the general-industry rule in 1910.146. How the competent person identifies spaces before work begins, and how they relate to trenches, is on excavation and confined spaces.

Readings that allow entry

Hazardous-atmosphere thresholds, 29 CFR 1926.1202
TestAcceptable rangeOutside the range
Oxygen19.5% to 23.5%Below 19.5% is deficient. Above 23.5% is enriched, and things burn more readily. Normal air is about 20.9%
Flammable gas or vaporUnder 10% of the lower flammable limitLower flammable limit (LFL) and lower explosive limit (LEL) name the same point
Toxic gasesBelow the permissible exposure limitA level immediately dangerous to life or health (IDLH) is a hazardous atmosphere outright

Three roles at the opening

Permit-space duties, 29 CFR 1926.1208 to 1926.1210
DutyEntrantAttendantEntry supervisor
PositionInside the spaceOutside, for the whole entryWhere the job needs; may also act as attendant or entrant if trained
The permitWorks under itKeeps count of who is insideChecks tests and equipment, then signs it
Conditions changeGets out when told or when an alarm soundsOrders everyone out and summons rescueEnds or suspends the entry
RescueWears the retrieval harnessNon-entry rescue onlyConfirms rescue services before entry

An attendant who climbs in becomes a second casualty and leaves no one outside to call for help.

What turns a confined space into a permit space

A confined space is large enough to enter and work in, has limited ways in or out, and is not designed for continuous occupancy. Those three facts alone call for no permit. A permit is required when the space also holds a serious hazard: a hazardous atmosphere or the potential for one, material that could engulf an entrant, walls that converge or a floor that slopes down to a narrow section, or any other serious safety or health hazard (29 CFR 1926.1202).

Rescue is planned before the first entry. Non-entry retrieval is the default, set up before the first entrant goes in, and a rescue service that enters is the backup. The wider emergency side, from first aid kits to weather, is on first aid, rescue and weather.

Permit-space set

These cards stay with permit spaces and the hazards around an entry. Ask what has to be true for anyone to go in, or to stay in, before you answer.

Card 1 of 6 · 0 right

Card 1

Workers will enter a 12-ft-deep vertical permit-required vault through a top manhole. Unless it would increase overall risk, what retrieval arrangement does 29 CFR 1926.1211 require?

Pick an answer. A short note for each option, A to D, appears here.

Card 2

A superintendent has run three fire evacuation drills on a project that also has a permit-required confined space and a tower crane. What should the NEXT drill test?

Pick an answer. A short note for each option, A to D, appears here.

Card 3

A crew will enter a tank that is connected by piping to a line carrying a flammable liquid. What is the MOST effective way to isolate the line before entry?

Pick an answer. A short note for each option, A to D, appears here.

Card 4

A storm knocks out temporary power while one crew works in a basement, another is on a scissor lift, and two entrants are inside a permit-required tank ventilated by an electric blower. What should the supervisor confirm FIRST?

Pick an answer. A short note for each option, A to D, appears here.

Card 5

Entrants will clean a sewage lift station wet well that contains a pump set to start automatically on float level. Before entry, what should the supervisor verify?

Pick an answer. A short note for each option, A to D, appears here.

Card 6

A crew working in a sewer manhole first notices a rotten-egg odor, and a few minutes later the odor seems to fade. How should the supervisor interpret this?

Pick an answer. A short note for each option, A to D, appears here.

    Next sheets

    Run the entry roles on your phone

    Short repeat sets in the app are how look-alike rules stop looking alike.