Skip to the sheet
Tailgate BriefSTSC study sheets
Menu

Sheet 17Domain 3 of 5 · Health Hazards and Basic Industrial Hygiene

Lifting, vibration and noise exposure in STSC Domain 3

Construction noise is limited to 90 dBA averaged over an 8-hour shift under 29 CFR 1926.52, the federal construction standard, and the allowed time halves for every 5 dB above that. Ergonomics has no construction standard at all, so the cards on this sheet about lifting, posture and vibration turn on judgment about what each task does to the body.

Construction noise: sound level against allowed hours

85 dBA120 dBA90 dBA8 h, the 1926 limit95 dBA4 h100 dBA2 h105 dBA1 h110 dBA30 min115 dBA15 min or less
Allowed daily duration by sound level under 29 CFR 1926.52, Table D-2. Impact noise has its own ceiling of 140 dB peak.

Practice: lifting, vibration and hearing

Cement bags, block, breakers, rebar, tile and drywall: most cards start from a trade task you would recognize.

Card 1 of 16 · 0 right

Card 1

A crew hand-carries 94-lb bags of portland cement from a pallet on the ground to a mixer all morning. Which ergonomic risk factor should the supervisor treat as the PRIMARY concern?

Pick an answer. A short note for each option, A to D, appears here.

Card 2

A crew is exposed to 100 dBA from a jackhammer. Using OSHA's Appendix B method, how should the supervisor apply the earplugs' labeled NRR to estimate the protected level?

Pick an answer. A short note for each option, A to D, appears here.

Card 3

Masons repeatedly pick up concrete block stacked directly on the ground. Which intervention BEST reduces their risk of back injury?

Pick an answer. A short note for each option, A to D, appears here.

Card 4

Which of the following would be considered an administrative control for reducing noise exposure?

Pick an answer. A short note for each option, A to D, appears here.

Card 5

A crew breaks concrete with pneumatic breakers on winter mornings. Which work practice BEST reduces their risk of hand-arm vibration syndrome?

Pick an answer. A short note for each option, A to D, appears here.

Card 6

Two workers on a demolition crew report hand symptoms after months of jackhammer use. Which control should the supervisor pursue FIRST under the hierarchy of controls?

Pick an answer. A short note for each option, A to D, appears here.

Card 7

Ironworkers tying rebar on a bridge deck spend hours bent at the waist. Which control BEST addresses the main ergonomic risk?

Pick an answer. A short note for each option, A to D, appears here.

Card 8

An excavator operator on a rough, rutted site reports low-back pain at the end of each day. Which ergonomic factor is the MOST likely contributor?

Pick an answer. A short note for each option, A to D, appears here.

Card 9

A long-time concrete chipper says the fingertips turn white and numb on cold mornings after using a chipping hammer. What should the supervisor do?

Pick an answer. A short note for each option, A to D, appears here.

Card 10

A tile setter routinely strikes tiles with the heel of the hand to seat them. Which ergonomic risk factor does this practice MAINLY create?

Pick an answer. A short note for each option, A to D, appears here.

Card 11

A rebar fabrication crew stands in one spot on a concrete slab all shift at a bending table. Which control BEST reduces the strain from this static standing?

Pick an answer. A short note for each option, A to D, appears here.

Card 12

A drywall finisher reports numbness and tingling in the thumb, index and middle fingers that is often worse at night. Which condition do these symptoms MOST suggest?

Pick an answer. A short note for each option, A to D, appears here.

Card 13

A NIOSH lifting-equation analysis of a block-handling task gives a Recommended Weight Limit (RWL) of 25 lb, and the blocks weigh 38 lb. How should the supervisor interpret the result?

Pick an answer. A short note for each option, A to D, appears here.

Card 14

During a site walk-through, which observation is the STRONGEST early warning sign of an ergonomic problem with a task?

Pick an answer. A short note for each option, A to D, appears here.

Card 15

Which combination of task features presents the HIGHEST risk of work-related musculoskeletal disorders?

Pick an answer. A short note for each option, A to D, appears here.

Card 16

Which hand-tool design principle does the MOST to reduce wrist injury risk?

Pick an answer. A short note for each option, A to D, appears here.

    Ergonomic risk factors, by name

    Force
    How hard the muscles work: a heavy load, a stiff trigger, a pump hose dragged against resistance.
    Repetition
    The same motion again and again with little recovery, such as driving screws through metal decking all shift.
    Awkward posture
    Joints held away from neutral: drilling overhead into a ceiling, kneeling to set floor drains, twisting to throw material into a dumpster.
    Contact stress
    A hard or sharp edge pressing into soft tissue, such as knees on rebar mats or a narrow bucket handle across the fingers.
    Hand-arm vibration
    Vibration that enters through the hands from grinders, breakers or compactor handles. Years of it can damage the nerves and blood vessels of the fingers.

    Judgment where the rules give no number

    OSHA has no ergonomics standard for construction and handles serious cases under the General Duty Clause. Choosing among fixes is a job for the hierarchy of controls.

    Ask what the job makes the body do, then how often and for how long. The weights, hours and days in a scene tell you which risk factor you are looking at.

    On noise, the 85 dBA figure that tends to sit next to 90 belongs to general industry; the construction noise limits sheet traces each figure to its rule.

    Heat adds to physical strain too: a crew working hard on a hot deck tires sooner and handles loads less surely. The heat and cold stress sheet covers that side, and if you would rather take this topic in a mixed set, open the practice test.

    Noise limits on longer and louder days

    Does the 90 dBA limit stretch to cover a 10-hour shift?

    No. Table D-2 in 29 CFR 1926.52 allows 90 dBA for 8 hours a day, so ten hours at that level is over the limit and the crew needs controls or hearing protection for the extra time.

    Is impact noise from nail guns or pile driving limited separately?

    Yes. 29 CFR 1926.52(e) says exposure to impulsive or impact noise should not exceed 140 dB peak sound pressure level, on top of the 8-hour average.

    Next sheets

    Keep the set in your pocket

    Pick up where you left off on iPhone or iPad when you have five minutes.