Skip to the sheet
Tailgate BriefSTSC study sheets
Menu

Sheet 11Domain 2 of 5 · Hazard Identification and Control

Falls, ladders and scaffolds: the 1926 rules an STSC supervisor enforces

By mid-morning on a four-story frame you can count a dozen ways to fall: an open stairwell, a leading edge on the deck, a ladder set at the wrong angle, a parapet lower than your knee. Fall protection on a construction site is several rules, one each for edges, ladders, scaffolds and aerial lifts, and this sheet sorts them by subpart.

Where heights catch supervisors

Edges, holes and roofs fall under 29 CFR 1926 Subpart M (1926.500 to 1926.503). Scaffolds sit in Subpart L, aerial lifts in 1926.453, and stairways and ladders in Subpart X. Each has its own fall-protection rule, so place the scene in the right subpart before you reach for a number. The 4-foot figure belongs to general industry; fall protection trigger heights lays out the 6-foot construction rule and its exceptions.

The cards on this sheet describe a crew mid-task, often in a hurry. Read each one for who is exposed at this moment, and to what drop.

Ladder setups have their own sheet: ladder rules on the STSC covers the 4-to-1 angle, the 3-foot extension above a landing and the top-step rule.

Guardrail heights in inches

0 in48 in19 inBreak that needs astair or ladder21 inMidrail, midway up39 inLowest42 inTop rail target45 inHighest
Top rail 42 in, plus or minus 3 (29 CFR 1926.502(b)(1)); midrail halfway between the top rail and the walking surface (1926.502(b)(2)); a stairway or ladder at any break in elevation of 19 in or more (1926.1051(a)).

Numbers a fall arrest system has to meet

Personal fall arrest and guardrail limits, 29 CFR 1926.502
LimitValueParagraph
Free fall before the system engages6 ft or less, with no contact with a lower level1926.502(d)(16)(iii)
Deceleration distance3.5 ft or less1926.502(d)(16)(iv)
Arresting force on a worker in a harness1,800 lb at most1926.502(d)(16)(ii)
Body belts for fall arrestNot allowed since Jan 1, 19981926.502(d)
Top rail strength200 lb outward or downward1926.502(b)(3)
Hole cover strengthTwice the load it may carry1926.502(i)(2)

Checked against eCFR on Oct 12, 2026.

Work-at-height cards

Harnesses, lifts, scaffolds, ladders, walkways and material stacked near openings.

Card 1 of 15 · 0 right

Card 1

A supervisor is issuing full-body harnesses to a crew that will work from boom lifts. Which consideration is MOST important for each worker's harness?

Pick an answer. A short note for each option, A to D, appears here.

Card 2

The main foot route to a material hoist crosses a muddy, rutted area where two workers slipped this week. Which action is the MOST effective control?

Pick an answer. A short note for each option, A to D, appears here.

Card 3

Several scissor lifts will operate at once in a tenant fit-out area. Which step BEST prevents tip-over and crushing incidents with the lifts?

Pick an answer. A short note for each option, A to D, appears here.

Card 4

Roofers arriving for the roofing phase have never used the site's horizontal lifeline system. When must they be trained on it?

Pick an answer. A short note for each option, A to D, appears here.

Card 5

An anchorage for personal fall arrest will be attached to a beam that cannot support 5,000 lb per worker. Who must design the anchorage system?

Pick an answer. A short note for each option, A to D, appears here.

Card 6

Workers are climbing the cross braces of a frame scaffold to reach a work platform 12 feet above grade. What should the supervisor require?

Pick an answer. A short note for each option, A to D, appears here.

Card 7

Carpenters stripping forms have piled scrap lumber with protruding nails on a stair landing that other trades use. What should the supervisor require?

Pick an answer. A short note for each option, A to D, appears here.

Card 8

An electrician repeatedly climbs a stepladder while holding a box of fittings in one hand. What should the supervisor require?

Pick an answer. A short note for each option, A to D, appears here.

Card 9

A worker in an articulating boom lift needs to reach a beam connection a few feet beyond the basket. He plans to unclip his lanyard from the basket anchor and clip it to the steel beam. What should the supervisor require?

Pick an answer. A short note for each option, A to D, appears here.

Card 10

A superintendent is reviewing the loads a supported scaffold must carry for a masonry crew stocking block and mortar. Under OSHA's scaffold standard, each scaffold and component must support its own weight plus at least how many times the maximum intended load?

Pick an answer. A short note for each option, A to D, appears here.

Card 11

During the pre-shift inspection of a frame scaffold, the competent person finds uncleated planks that extend only about 3 inches past the centerline of their end supports. What should be done before anyone uses the platform?

Pick an answer. A short note for each option, A to D, appears here.

Card 12

During a pre-use check, a carpenter finds a split side rail on an extension ladder. What should the supervisor ensure happens NEXT?

Pick an answer. A short note for each option, A to D, appears here.

Card 13

A mason is working from a supported frame scaffold, and the guardrails have not been installed yet. Under OSHA's scaffold standard, above what height over a lower level must the mason be protected from falling?

Pick an answer. A short note for each option, A to D, appears here.

Card 14

During a pre-shift inspection, a supervisor finds one leg of a frame scaffold resting on stacked concrete blocks to level it on sloped ground. What should be done?

Pick an answer. A short note for each option, A to D, appears here.

Card 15

Laborers have stacked drywall 3 feet from an unguarded interior hoistway opening on the third floor of a building under construction. What minimum setback from the hoistway does OSHA require for stored material?

Pick an answer. A short note for each option, A to D, appears here.

    After the fall: clearance and rescue

    A harness only works if there is room below it. Add the free fall, the deceleration distance, harness stretch and the worker's height below the D-ring, then a safety margin. For a 6-foot shock-absorbing lanyard tied off at D-ring height, that sum comes to roughly 18 feet below the anchor. Manufacturers publish clearance charts for each lanyard and self-retracting lifeline, so check theirs.

    Then plan the rescue. 29 CFR 1926.502(d)(20) requires prompt rescue of a fallen worker, or proof that workers can rescue themselves. Calling the fire department counts as a plan only if its crews can reach that height at that spot in time.

    Gear gets inspected before each use (1926.502(d)(21)), and a system that has stopped a fall comes out of service until a competent person inspects it and finds it undamaged and fit for reuse (1926.502(d)(19)).

    Next sheets

    Ten cards at lunch beats an hour on Sunday

    Short sets on your iPhone keep this domain fresh between site walks.